Clients want buildings ready for technologies they haven’t yet chosen. Veselina Lezginov, Content Strategist at Arrow Electric, explains how electrical contractors can distinguish between what needs installing now, what should be prepared for the future and what needs to wait for a defined specification
You’re halfway through a quote when the property owner says they want the installation ready for EV charging, battery storage or “whatever building automation comes next”. Which equipment? They’re not sure. When? Same answer.
Now you’re pricing a promise rather than a project, and the client will either overspend on capacity nobody uses or assume the system can handle anything. But there is a better way to handle that conversation, and it starts with separating what is known from what is not.
1. Install what is already defined
Before the conversation turns to the future, you will generally want the current requirements identified and written down. That means knowing which equipment and functions are needed, what load and operational demands apply, and which installations and controls sit inside the current scope. If any of that is still vague, it is worth settling it before the quote goes out.
Your design should rest on defined requirements and applicable standards, checked by suitably qualified people. This is much easier to price and to verify than a guess, and it keeps the current scope defensible.
2. Prepare for the future where it makes sense
Now that the present scope is clear, you can look at what might sensibly be prepared for. For instance, you may be able to allow space for future equipment or check whether a cable route is feasible, ideally while the building work is under way.
That said, provisions should be evaluated and not installed by default. It is worth asking whether the need is realistic and whether the saving is real. In one US cost comparison of modelled scenarios, installing EV charging infrastructure during construction cost more than 55% less than retrofitting it later, which reflects the demolition, trenching and circuit work a retrofit can involve.
Additionally, making provision for a possible upgrade is a design decision. Confirming that the system will actually support it needs equipment details and a proper technical assessment. Future readiness should be an informed choice made project by project.
3. Document what cannot yet be decided
This is where many projects come unstuck. Some future technologies cannot be properly specified until their equipment requirements are known, and the documentation should say so plainly. Record:
• What remains undecided;
• Which future requirements will need reassessment;
• What the current project does and does not include;
• Where further design approval or technical evaluation will be needed.
EV charging illustrates the point. Until a charger is selected, nobody can say what supply and load management it will need, so a reserved space or cable route should be recorded as exactly that. So what happens if the paperwork says nothing about this? You may inherit an expectation that nobody has actually assessed.
Also, ensure each item is included in the project scope, not in memory or an email chain. Clear exclusions and assumptions are often worth more than vague promises.
Turn the conversation into a clear product decision
Take an owner who wants to accommodate future electrical upgrades but has not selected any equipment. You can sort the request into three decisions:
• Install now: requirements that are known and approved.
• Prepare for later: reasonable provisions the project justifies, such as agreed space for future equipment or a route assessed as feasible.
• Reassess later: future requirements, such as EV charging or battery storage, that need a separate technical decision once equipment is known.
Once these three categories sit in the project scope, you also have a ready answer when a client later asks why a new charger needs its own design review.
Next time a client asks you to make a building ready for the future, start by asking what they actually know today. That one question usually shows how much needs doing now and how much can wait for a proper decision. The best prepared installation may well be the one carrying the least unused infrastructure.
Veselina Lezginov is a Content Strategist supporting Arrow Electric.