Siemens Smart Infrastructure has received an order from the Regensburg transport authority “das Stadtwerk Regensburg.Mobilität GmbH” in Germany to equip the bus depot in the Markomannenstrasse for electromobility. Siemens will supply the charging infrastructure as well as the power distribution technology. Operations are scheduled to start in 2021. Electric buses were first introduced in the city centre of Regensburg in 2017.
To connect the depot to the public power grid and to distribute electricity in the building, Siemens is also installing transformers and a Sivacon S8 low-voltage switchboard.
The individual charging stations in the depot will then by supplied with power via a Sivacon 8PS busbar trunking system. What makes this form of power distribution unique are the special connectors that easily adapt the busbar trunking system to the special characteristics of the existing building. This solution is more flexible than cables, easier and faster to install. Additional loads can be added via tap-off units as needed. When planning the power distribution system, a digital twin of the busbar trunking system is created by using digital planning tools. A future modular expansion of the system can thereby be simulated and included in the planning process already today. This enables forward-looking and economic planning as well as efficient implementation.